English

This phase of the validation process is conducted to ensure that equipment, systems, or facilities are installed correctly and meet all technical specifications, manufacturer requirements, and regulatory standards. This includes, among other things, the acceptance of proper electrical installation, the detailed review of all input and output signals, and the correct calculation of measured value.

ico pointerKAYE HEADQUARTERS

Amphenol Advanced Sensors Germany GmbH 
Sinsheimer Strasse 6
D-75179 Pforzheim

T +49 (0) 7231-14 335 0
F +49 (0) 7231-14335 29
kaye-ccpf@amphenol-sensors.com  
www.kayeinstruments.com 

KAYE Americas 

Amphenol Thermometrics, Inc.
967 Windfall Road
St. Marys, PA 15857
Tel: +1(814) 834-9140
Fax: +(814) 781-7969
kaye-us@amphenol-sensors.com 


Company Details  |  Disclaimer/ Terms of Use  |  Privacy Policy

ico pointer  QUICK CONTACT

ico alert KAYE ALERT NEWSLETTER  

Stay informed about our latest products and important software updates.

SUBSCRIBE TO NEWSLETTER